The Main Power Is Ready

The head of the chamber announced that the warehouses of the chamber have been connected to the city’s electricity system.

The representative of Slemani electricity said that they had applied the ABB electrification technology to supply the warehouses with 35 to 40 Megawatt of electricity and that the instructions of the general directorate of the city are followed.